Light engines head to Sheboygan. This move was necessitated by maintenance at the Edgewater Generating Station: the last loaded coal train into the plant went up about a week ago, and shortly after, the tracks at the plant were taken out of service for repairs. Rather than leave the locomotives sit in Sheboygan, they were sent back to Butler where they could be put to better use. Now that the power plant is again open, this crew brought the engines up. They should have enough time to assemble the empty hopper train and return to Butler within their 12 hours.